Almost Done

May 19th, 2009 1 Comment

Finally, at least one of the rooms of the house that were under construction is already done. The new bathroom was located between two bedrooms so that it is easier to access. The new undermount sink adds to the beautiful design of the whole bathroom. Also, it has a bathtub and a telephone shower. The house now has two bathrooms so there is no need to hurry during class days since there are already two bathrooms that can be used. I just wish I can use the new bathroom before I leave for school since the water pipes have not yet been installed. I think the workers are doing it right now. I am so excited.

Share and Enjoy:
  • Digg
  • del.icio.us
  • Facebook
  • Google Bookmarks
  • StumbleUpon
  • Technorati
  • Reddit

One Response to “Almost Done”

John1007

May 24th, 2009 - 4:40 pm

Very nice site!

Leave a Reply